Client: Alliance Steel (M)Sdn Bhd(ASSB)Contractor:ACRE and CISDI Engineering Co.,LtdCity of project site :Kuantan,MalaysiaDates of signing contract / commissioning :
Mar.3rd,2016/Dec.30th ,2017
Contents of project:
2x56 top charging coke oven battery with production 1,100,000 t/a
Coal preparation system
Coke making plant including 1x140t/h CDQ
Coke handling system
Ventilation & air conditioning de-dusting system
Oven steel work, Refractory materials, Bracing system,etc
Control system, electric system and instrumentation system.
Gas purification plant
lime & soft-burned dolomite projects
Features of major design:
Coke making plant
2x56 ovens top charging coke oven battery with chamber height of 6m.
Gas purification plant with capacity of 63,000Nm3/h
Exhauster & condenser unit
H2S/NH3 removal unit
De-acidifier and ammonia stripping unit
Naphthalene removal unit
Naphthalene distillation unit
Sulfur recovery unit
Oil depot unit
lime & soft-burned dolomite project
the annual active lime production will be 397,900 t/a and the annual soft-burned
dolomite production will be 267,400 t/a including 4 sets of double shaft kilns