视窗
loading...
ISPAT ISCOR NEWCASTLE BATTERY NO. 2 PROJECT ISPAT ISCOR NEWCASTLE GAS PLANT PROJECT
SOURCE: AUTHOR:acre_en DATE:02 September 2021
+ . -
Client: Arcelormittal South Africa Limited
Contractor:ACRE and CITIC International Corporation Co.
City of project site :Newcastle, South Afirca
Dates of signing contract / commissioning :

Oct.23rd,2004/Oct.25th,2006(coke oven gas plant modification project) 

Dec.7th ,2006(coke oven modification project)

43801468375118

Contents of project:

Had included scopes of modification for coke oven and gas plant

The scope of  coke oven modification project had mainly included Refractory work, Emission control system for coal charging and coke pushing, Wet quenching tower, gas mixing station, COG pre-heater, electrics, Instrumentation, Automation& Communication, etc of the existing No.2 coke oven. After revamp, the coke production of coke oven had been 500,000t/a. The scope of gas plant modification project had mainly included Flushing liquor decanter unit, Primary gas cooler unit ,Electrostatic tar precipitator (ETP) unit, H2S and NHscrubbing unit, NaOH adding unit, De-acidifier and NHstill unit, Chilling water unit ,Electric system, Instrumentation, etc of the existing No.2 , No.3 and No.4 gas plants. After revamp, the capacity of by-product plant had been 80,000m3/h.

Features of major design:

Scope of contracting:

In the project for coke oven modification, ACRE had been responsible for complete Engineering, equipment & material of supply, installation, technical service at site, training and construction (EPC).In the project for gas plant modification, ACRE had been responsible for complete Engineering, equipment & material of supply, technical service at site (EP).

Project Highlights:

The end-user had highly praised this project of a huge miracle created by people of China.

TEL:+86-411-82460069/+86-411-82460386
FAX:+86-411-82460000
E-MAIL:zhangyanxin@acre.com.cnhefei@acre.com.cn
© 2022 ACRE,ALL Rights Rcserved 辽ICP备17000534号-1